The UK Offshore Oil and Gas Fabricators Directory 2016

Projects and Markets (continued)

Dudgeon – Offshore Wind Substation Topsides and Jacket Client: Statoil UK Period: 2015 to 2016 (under construction) Contract: Engineering, procurement and construction (EPC) Structure: 1,800 tonne high voltage electrical substation topsides. 1,500 tonne jacket substructure with suction piles Golden Eagle – Living Quarters, Bridge and Flare Modules Client: Nexen Petroleum UK Ltd Period: 2011 to 2014 Contract: Engineering, procurement and construction (EPC) Structure: 140-man, 2,000 tonne living quarters, 550 tonne bridge, 220 tonne flare

Katy – Minimal Facilities Platform Client: ConocoPhillips UK Period: 2012 Contract: EPC Structure:

Jacket substructure, piles and topside

Thorton Bank – Offshore Wind Substation Jacket Client: Smulders - Belgium Period: 2011 Contract: Build only and deliver Structure: 900 tonne offshore substation jacket substructure

page 100

THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY 2016

Made with