Decommissioning Insight 2019
1
Figure 31: Historical Variation in Removal Costs per Tonne in the Southern North Sea and Irish Sea
20,000
2
18,000
16,000
3
14,000
12,000
10,000
4
8,000
6,000
5
4,000
2,000
Estimated Cost per Tonne (£ - 2018 Money)
6
0
2017
2018
2019
Topside and Substructure
Source: OGUK, OGA
7
2017 Survey
2018 Survey
2019 Survey
Removals – Cost per Tonne
Average
Median
Average
Median
Average
Median
8
Topside & Substructure £3,941
£3,936
£3,690
£2,839
£2,970
£3,298
NOTE: topsides and substructure are included together in this region. This is because assets in the SNS and IS are usually smaller, in comparison with NNS and CNS, and are generally removed in one campaign, making it difficult to separate costs effectively. The southern North Sea and Irish Sea has seen a year on year fall in forecast removal costs per tonne for topsides and substructures. However, the 2019 dataset has an increased range in the input value and while the average costs have reduced, the median has seen an increase.
9
10
11
59