Decommissioning Insight 2019
DECOMMISSIONING INSIGHT 2019 5. A Decade of Decommissioning Insight
10 years of Insights...
• Survey launched based on OGUK Operator Activity Survey • Total cost of decommissioning estimated £27bn • £1bn per annum spend
2010
• Survey broken down into NNS, CNS and SNS • Total decommissioning costs estimated at £27bn —Wells 16%; Removals 34%
2011
• OGUK performs first dedicated Insight operator survey • UKCS well decommissioning estimates rise to 44% of total cost
2012
• Survey adopts a 10- year lookahead for first time; estimating £10.4bn • OGUK issues the
2013
• Survey
structured around WBS for first time
decommissioning Work Breakdown Structure (WBS)
2014
• Participation
increases to 28 operators • 10-year outlook reaches £14.6bn
Key Projects
Heerema’s Thialf lands part of the
Murchison jacket at AF Offshore Decom’s Environmental Base in Vats, Norway’
Brent Delta topsides removed in 24,000t single lift
Miller platform and topsides removed by Saipem’s S7000
30
Made with FlippingBook - Online magazine maker