8 The Scope of Decommissioning
In Summary The Decommissioning Work Breakdown Structure (WBS) is detailed in Oil & Gas UK’s Decommissioning Cost Estimate Guidelines . 5 The WBS shows all elements of a typical decommissioning project. Different expertise is required within each WBS element, from engineering practitioners at the front end, to operational expertise as the installation is made safe, to lifting scopes, subsea scopes and finally re-use, recycling and disposal. 6
Operator Project Management 1
Figure 27: Decommissioning Work Breakdown Structure
OUT OF SERVICE
OUT OF SERVICE
2
3
4
5
6
9.8%
48.8%
3.0%
3.1%
6.6%
9.8%
48.8%
3.0%
3.1%
6.6%
Post-CoP OPEX 5
Well Decommissioning
Facilities / Pipeline De-Energising
Topsides Preparation
Topsides Removal
5 Oil & Gas UK – Decommissioning Cost Estimate Guidelines 6 Operational expenditure after production has ceased.