Figure 21: Weight of UKCS Substructure to be Decommissioned
1
120,000
UK CNS
UK NNS & WoS
UK SNS & IS
100,000
2
80,000
3
60,000
4
40,000
20,000
5
Substructure Weight to be Decommissioned (tonnes)
0
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
6
Source: Oil & Gas UK, OGA
Figure 21 shows the forecast substructure weights to be decommissioned in the UKCS. This total excludes concrete gravity-based (CGB) structures. Note that under OSPAR Decision 98/3, the largest and oldest substructures may be decommissioned in situ if derogation is justified and granted. Therefore, the chart does not represent expected removal weights.
7
Similar to the topsides, the majority of substructure removals activity is forecast to be later in the survey time period, with 82 per cent of the weight scheduled for removal from 2022 onwards